• Strata โ„– 001

    ยง 01 The Load Quadrupling US Nuclear Output Is an Advocacy Position, Not a Pipeline. The National Interest pieces name the ambition; the NRC construction permit queue names the gap. ~100 GWUS nuclear fleet, operational 2024 Two pieces in The National Interest this week โ€” one attributed to Constellation Energy’s narrative orbit, one to X-energy…