• Strata № 001

    STRATA № 001  ·  24.MAY.26  ·  7 min read  ·  energy & extractives, weekly § 01 The Load Quadrupling US Nuclear Output Is an Aspiration. The NRC Queue Is the Reality Check. Operator-adjacent advocacy is setting a 400 GW target; the permitting infrastructure to build toward it does not exist. ~100 GWUS nuclear fleet, operating…